编辑 | blame | 历史 | 原始文档

Ellipsis 文本自动省略号

文本过长自动处理省略号,支持按照文本长度和最大行数两种方式截取。

引用方式:

import Ellipsis from '@/components/Ellipsis'

export default {
    components: {
        Ellipsis
    }
}

代码演示 demo

<ellipsis :length="100" tooltip>
        There were injuries alleged in three cases in 2015, and a
        fourth incident in September, according to the safety recall report. After meeting with US regulators in October, the firm decided to issue a voluntary recall.
</ellipsis>

API

参数 说明 类型 默认值

tooltip | 移动到文本展示完整内容的提示 | boolean | -
length | 在按照长度截取下的文本最大字符数,超过则截取省略 | number | -