zhaojs
2023-09-27 74098f1401afe40f961d1d167bb18dd0a71c4d59
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
let _boundaryCheckingState = true; // 是否进行越界检查的全局开关
 
/**
 * 把错误的数据转正
 * @private
 * @example strip(0.09999999999999998)=0.1
 */
function strip(num, precision = 15) {
  return +parseFloat(Number(num).toPrecision(precision));
}
 
/**
 * Return digits length of a number
 * @private
 * @param {*number} num Input number
 */
function digitLength(num) {
  // Get digit length of e
  const eSplit = num.toString().split(/[eE]/);
  const len = (eSplit[0].split('.')[1] || '').length - +(eSplit[1] || 0);
  return len > 0 ? len : 0;
}
 
/**
 * 把小数转成整数,如果是小数则放大成整数
 * @private
 * @param {*number} num 输入数
 */
function float2Fixed(num) {
  if (num.toString().indexOf('e') === -1) {
    return Number(num.toString().replace('.', ''));
  }
  const dLen = digitLength(num);
  return dLen > 0 ? strip(Number(num) * Math.pow(10, dLen)) : Number(num);
}
 
/**
 * 检测数字是否越界,如果越界给出提示
 * @private
 * @param {*number} num 输入数
 */
function checkBoundary(num) {
  if (_boundaryCheckingState) {
    if (num > Number.MAX_SAFE_INTEGER || num < Number.MIN_SAFE_INTEGER) {
      console.warn(`${num} 超出了精度限制,结果可能不正确`);
    }
  }
}
 
/**
 * 把递归操作扁平迭代化
 * @param {number[]} arr 要操作的数字数组
 * @param {function} operation 迭代操作
 * @private
 */
function iteratorOperation(arr, operation) {
  const [num1, num2, ...others] = arr;
  let res = operation(num1, num2);
 
  others.forEach((num) => {
    res = operation(res, num);
  });
 
  return res;
}
 
/**
 * 高精度乘法
 * @export
 */
export function times(...nums) {
  if (nums.length > 2) {
    return iteratorOperation(nums, times);
  }
 
  const [num1, num2] = nums;
  const num1Changed = float2Fixed(num1);
  const num2Changed = float2Fixed(num2);
  const baseNum = digitLength(num1) + digitLength(num2);
  const leftValue = num1Changed * num2Changed;
 
  checkBoundary(leftValue);
 
  return leftValue / Math.pow(10, baseNum);
}
 
/**
 * 高精度加法
 * @export
 */
export function plus(...nums) {
  if (nums.length > 2) {
    return iteratorOperation(nums, plus);
  }
 
  const [num1, num2] = nums;
  // 取最大的小数位
  const baseNum = Math.pow(10, Math.max(digitLength(num1), digitLength(num2)));
  // 把小数都转为整数然后再计算
  return (times(num1, baseNum) + times(num2, baseNum)) / baseNum;
}
 
/**
 * 高精度减法
 * @export
 */
export function minus(...nums) {
  if (nums.length > 2) {
    return iteratorOperation(nums, minus);
  }
 
  const [num1, num2] = nums;
  const baseNum = Math.pow(10, Math.max(digitLength(num1), digitLength(num2)));
  return (times(num1, baseNum) - times(num2, baseNum)) / baseNum;
}
 
/**
 * 高精度除法
 * @export
 */
export function divide(...nums) {
  if (nums.length > 2) {
    return iteratorOperation(nums, divide);
  }
 
  const [num1, num2] = nums;
  const num1Changed = float2Fixed(num1);
  const num2Changed = float2Fixed(num2);
  checkBoundary(num1Changed);
  checkBoundary(num2Changed);
  // 重要,这里必须用strip进行修正
  return times(num1Changed / num2Changed, strip(Math.pow(10, digitLength(num2) - digitLength(num1))));
}
 
/**
 * 四舍五入
 * @export
 */
export function round(num, ratio) {
  const base = Math.pow(10, ratio);
  let result = divide(Math.round(Math.abs(times(num, base))), base);
  if (num < 0 && result !== 0) {
    result = times(result, -1);
  }
  // 位数不足则补0
  return result;
}
 
/**
 * 是否进行边界检查,默认开启
 * @param flag 标记开关,true 为开启,false 为关闭,默认为 true
 * @export
 */
export function enableBoundaryChecking(flag = true) {
  _boundaryCheckingState = flag;
}
 
 
export default {
  times,
  plus,
  minus,
  divide,
  round,
  enableBoundaryChecking,
};