zhaojs
2023-10-20 a4e4986fb4612a49337fc7ade2417eefdf3889b8
api/ScheduledTasks/appsettings.json
@@ -7,20 +7,18 @@
    }
  },
  "AllowedHosts": "*",
  //有赞和1688 token更新 每天凌晨1点
  "job_tokenupdate": "0 0 1 * * ?",
  //数据统计 每天凌晨3点
  "job_datastatic": "0 0 3 * * ?",
  //有赞订单校验
  "job_yztradeverify": "0 0 2 * * ?",
  //分销微信小程序token更新 每隔10分钟触发一次
  "job_fxwxtoken": "0 0/10 * * * ?",
  //短信系统预警 每隔5分钟触发一次
  "job_smswarning": "0 0/5 * * * ?",
  "DbConnection": [
    {
      //正式
      "Key": "Main",
      "ConnectionString": "server=123.60.83.120;port=3306;uid=fxuser;pwd=opRer16#2e2rdq;database=fx_main;Allow Zero Datetime=True;Charset=utf8;"
    },
    {
      //正式
      "Key": "Sms",
      "ConnectionString": "server=123.60.83.120;port=3306;uid=fxuser;pwd=opRer16#2e2rdq;database=sms_sender;Allow Zero Datetime=True;Charset=utf8;"
    }
  ]
}